Cal Trans Gorda, CA
Phase 2
Doubling Inverter Capacity
|
 |
 |
Loading the Phase B cabinet into the power building.
|
Inside the Phase A AC Cabinet.
|
 |
 |
Outside of the Phase B Cabinets.
|
Hawker Batteries with cable tray and distribution blocks.
|
|
 |
External switch gear that make the expansion possible.
|
View from the door. Phase A equipment on the left, Phase B on the right and batteries in the back.
|