Installing Solar Since 1983
License Number 773985

Home

Contact Resources Case_Studies Portfolio Practices Services

Cal Trans Gorda, CA

Phase 2
Doubling Inverter Capacity
Loading the Phase B cabinet into the power building.
Inside the Phase A AC Cabinet.
Outside of the Phase B Cabinets.
Hawker Batteries with cable tray and distribution blocks.
External switch gear that make the expansion possible.
View from the door. Phase A equipment on the left, Phase B on the right and batteries in the back.