Voler Team Apparel, Grover Beach, CA
Finished Module Installation
Racks, awaiting modules and wiring
Side view of modules, racks, strut posts and conduit. Corrosion resistance is key because installtion is two block from the ocean.
Direct Power Power Posts in epoxy sealant.
Six Fronius IG4550 inverters on exterior wall.
Bus bars in 800 amp switch gear prior to supply side tap. Lugs were tapped on bottom holes.